General Information
Report Type: Assessment Report - Hardrock
Authors: Frew, A. M.
NTS:
Property: Oro
Company: Yukon Minerals Corporation
Claims: Oro 1-30
Date Submitted: 08 Dec 1986
Holes Drilled: 10
Metres Drilled: 609.00
Types of work done: Diamond - Drilling, Soil - Geochemistry, Bedrock Mapping - Geology, EM - Ground Geophysics, Line Cutting - Other, Prospecting - Other, Backhoe - Trenching, Handblast - Trenching
Downloads
Type | |
---|---|
Report | Download PDF |
Location Map
Occurrences
Name | Number | Type | Status |
---|---|---|---|
105B 017 | Hardtack | Hard-rock | Drilled Prospect |