General Information
Report Type: Assessment Report - Hardrock
Authors: Silver Standard Mines
NTS:
Property: Sterling
Company: Silver Standard Mines
Claims: Sterling B-1, 2, 9, 10
Date Submitted: 28 May 1972
Holes Drilled: 5
Metres Drilled: 250.55
Types of work done: Diamond - Drilling
Downloads
Type | |
---|---|
Report | Download PDF |
Location Map
Occurrences
Name | Number | Type | Status |
---|---|---|---|
115P 010 | Ridge | Hard-rock | Showing |