General Information
Report Type: YMEP Report - Hardrock
Authors: Gibson, J.
NTS: 115J14, 115J15, 115O02, 115O03
Property: Ballarat Project
Company: Stakeholder Gold Corp.
Claims: KIT, TIK, BA, BAL
Date Submitted: 31 Jan 2017
Holes Drilled: 443
Metres Drilled: 1,728.15
Types of work done: Probe - Drilling, RAB (Rotary Air Blast) - Drilling, Rock - Geochemistry, Soil - Geochemistry, IP - Ground Geophysics, Photogrammetry - Remote Sensing
Downloads
Type | |
---|---|
Report | Download PDF |
Data | Open |