Find publications, data and maps managed by the
Yukon Geological Survey

Assessment Report Details


Report Number
097713
Title
2021 Geological, Geochemical, Geophysical and Diamond Drilling Report on the Einarson Project
Year
2021


General Information

Report Type: Assessment Report - Hardrock
Authors: De Pasquale, J., Hindemith, M.
NTS:
Property: Einarson
Claims: Elko 19-40; Emer 1-54; Forks 1-8; G 832; H1-174; Huo 1-560; Io 1-206; L 19-22; L 35-36, 49, 50, 63, 64; M 1-52; MLC 1-176; Mu 1-108; N 9-128; Niao 79-174; OA 1-84; OB 18-75; Odd 1-297; PA 1-32; ...
Date Submitted: 03 Dec 2024
Holes Drilled: 21
Metres Drilled: 4,340.00
Types of work done: Diamond - Drilling, Rock - Geochemistry, Silt - Geochemistry, Soil - Geochemistry, Downhole Survey - Ground Geophysics, Photogrammetry - Remote Sensing

Downloads

Report and data is made publicly available 5 years after date submitted. This will be sometime after 03 Dec 2029.

Location Map