Find publications, data and maps managed by the
Yukon Geological Survey

Assessment Report Details


Report Number
097434
Title
Prospecting, Geological Mapping, Excavator Trenching, Road and Trail Building and Diamond Drilling
Year
2020


General Information

Report Type: Assessment Report - Hardrock
Authors: Willms, K.
NTS:
Property: Mount. Hinton
Claims: Granite, Hinton, Hinton II, Hinton III, Hinton IV, Hinton V, Key, GC, Lock, Moon, Red, Jen, GC
Date Submitted: 15 Mar 2021
Holes Drilled: 24
Metres Drilled: 4,294.75
Types of work done: All Weather Road - Development, Surface, Diamond - Drilling, Rock - Geochemistry, Detailed Bedrock Mapping - Geology, Mechanical - Trenching

Downloads

Report and data is made publicly available 5 years after date submitted. This will be sometime after 15 Mar 2026.

Location Map