Find publications, data and maps managed by the
Yukon Geological Survey

Assessment Report Details


Report Number
097406
Title
Assessment Report Describing Geochemical Sampling, Prospecting, Geophysical Surveys, Rotary Air Blast Drilling and Diamond Drilling at the Rau Project of the Rackla Gold Property
Year
2019


General Information

Report Type: Assessment Report - Hardrock
Authors: Schneebeli, A., Coulter, A. B.
NTS:
Property: Rackla Gold
Claims: Rau 1-100; ACX 1-310, Gam 1-32; R 61, 63, 65, 67, 69, 71, 73, 75, 77, 79, 81, 83, 85, 87, 89, 91, 93, 95, 97, 99, 101, 103, 105, 107, 109-1337; S 1-1250; GF 3-4; and Q 1-24
Date Submitted: 04 Dec 2020
Holes Drilled: 19
Metres Drilled: 2,942.02
Types of work done: Diamond - Drilling, Rotary - Drilling, Rock - Geochemistry, Soil - Geochemistry, IP - Ground Geophysics, Magnetics - Ground Geophysics

Downloads

Report and data is made publicly available 5 years after date submitted. This will be sometime after 04 Dec 2025.

Location Map