General Information
Report Type: Assessment Report - Hardrock
Authors: Dorion, S.
NTS:
Property: The Mahtin Group
Company: StrikePoint Gold Inc.
Claims: Mahtin 1-34, 37-916; May 1-40; Qu 1-48; Forty 1-270, 273-282, 289-294; Callum 1-8; Alp 1-128; Alpine 1, 7-12, 18, 22, 24-29, 31, 33-38
Date Submitted: 06 Jul 2018
Holes Drilled: 9
Metres Drilled: 843.00
Types of work done: RAB (Rotary Air Blast) - Drilling, Rock - Geochemistry, Bedrock Mapping - Geology
Downloads
Type | |
---|---|
Report | Download PDF |
Data | Open |
Location Map
Occurrences
Name | Number | Type | Status |
---|---|---|---|
115P 007 | Mahtin | Hard-rock | Drilled Prospect |