General Information
Report Type: Assessment Report - Hardrock
Authors: Nelson, M., Raven, W.
NTS:
Property: Risby Tungsten
Company: Playfair Mining Ltd.
Claims: X 1-28,Risby 1-4,Gold 1-2,WO3 1-4
Date Submitted: 26 Feb 2006
Holes Drilled: 6
Metres Drilled: 754.88
Types of work done: Diamond - Drilling
Downloads
Type | |
---|---|
Report | Download PDF |
Location Map
Occurrences
Name | Number | Type | Status |
---|---|---|---|
105F 034 | Risby | Hard-rock | Deposit |