General Information
Report Type: Assessment Report - Hardrock
Authors: Pilcher, S. H., Plumb, W. N.
NTS:
Property: Top
Company: Cassiar Asbestos Corporation
Claims: Top,Lake 1-18,North 1-32,East 1-32.South 1-32
Date Submitted: 07 Jan 1991
Holes Drilled: 35
Metres Drilled: 2,644.50
Types of work done: Diamond - Drilling, Detailed Bedrock Mapping - Geology, EM - Ground Geophysics, Magnetics - Ground Geophysics, Line Cutting - Other, Handblast - Trenching, Mechanical - Trenching
Downloads
Type | |
---|---|
Report | Download PDF |
Location Map
Occurrences
Name | Number | Type | Status |
---|---|---|---|
105G 034 | Fyre Lake | Hard-rock | Deposit |