General Information
Report Type: Assessment Report - Hardrock
Authors: McMichael, R. C., Heim, S.
NTS:
Property: Minto Creek
Company: Silver Standard Mines Ltd.
Claims: Minto
Date Submitted: 25 May 1973
Holes Drilled: 13
Metres Drilled: 1,868.12
Types of work done: Air Strip - Development, Surface, All Weather Road - Development, Surface, Diamond - Drilling, Drill Core - Geochemistry, Rock - Geochemistry, Soil - Geochemistry, Water - Geochemistry, Bedrock Mapping - Geology, Line Cutting - Other, Prospecting - Other, Surveying - Other, Process/Interpret - Pre-existing Data, Mechanical - Trenching
Downloads
Type | |
---|---|
Report | Download PDF |
Location Map
Occurrences
Name | Number | Type | Status |
---|---|---|---|
115I 021 | Minto Main | Hard-rock | Past Producer |