General Information
Report Type: Assessment Report - Hardrock
Authors: Alrae Engineering Ltd.
NTS:
Property: Key
Company: Bonnet Plume River Mines Ltd.
Claims: Key 1-56
Date Submitted: 12 Dec 1969
Holes Drilled: 5
Metres Drilled: 434.04
Types of work done: Diamond - Drilling, Drill Core - Geochemistry, Rock - Geochemistry, Bedrock Mapping - Geology
Downloads
| Type | |
|---|---|
| Report | Download PDF |
Location Map
Occurrences
| Name | Number | Type | Status |
|---|---|---|---|
| 106E 002 | Irene | Hard-rock | Drilled Prospect |

